REALIZATIONS

Projects realized using our technology

DIFFICULT LOCATION FOR A NEW SEWAGE INSTALLATION

The Gravity Drilling Technology also includes networks made of PE pipes. One of such projects was the construction of a sanitary sewage connection for a single-family residential building in the Redłowo estate in Gdynia.

CONSTRUCTION OF A RAINWATER DRAINAGE SYSTEM IN GDAŃSK

Construction of a 15 meter long rainwater drainage system with a 2% gravity drop, using PP pipe modules with a diameter of 225 mm.

STORM WATER DRAINAGE SYSTEM IN GDANSK

With the use of gravity drilling technology using the MTM 1200, the rainwater drainage connections were made with a diameter of 225 mm and 315 mm, each with a length of about 14 meters. 

GDYNIA - DRAINAGE OF THE COMMUNICATION NODE

As part of the project "Construction of the S6 expressway Słupsk -Gdańsk", using the MTM 1200 system, a sanitary installation was implemented - connections to street inlets - drainage of the Wielki Kack junction.