Renovation of existing installations

Technology also allows the renovation and clearing of the existing, damaged sewage pipes, without the need to interfere with the surface, similar to the method of static cracking. The solution is used wherever urgent intervention is needed. In the event of a failure in densely built-up urban spaces, where interference with the existing infrastructure would generate high social costs. The broken installation is filled with injection leaven and drilling is performed in the same way as in the case of trenchless laying of the installation in the ground.

GRAND PRIX 2022 FOR GRAVITY DRILLING TECHNOLOGY

The XXVII edition of the WOD-KAN 2022 fair has come to an end. It was a very interesting and fruitful event for us. Our technology and products aroused great interest among those who announced our stand. For many of them, our innovation was a pleasant surprise in the form of a device enabling the fully trenchless construction of underground sewage systems between existing sewage wells in dense urban buildings and the ability to work in all ground conditions and in places with groundwater.

DIFFICULT LOCATION FOR A NEW SEWAGE INSTALLATION

The Gravity Drilling Technology also includes networks made of PE pipes. One of such projects was the construction of a sanitary sewage connection for a single-family residential building in the Redłowo estate in Gdynia. The installation of the PE-RC DN160 pipe should be 37 meters long, with a 5.5% gravity drop, between the existing DN1200 well and the excavation.

plan
Installation project
profil
Installation project

In the case of this project, it was difficult to locate the pipeline among dense built residential buildings and home gardens. In the area of work, there was a significant slope of the terrain and slopes limiting the maneuvering of any construction equipment.

lokalizacja
Installation location

Initially, it was assumed that the installation would be performed with the use of a HDD drilling rig, but due to the above-mentioned field inconveniences, the company declaring execution with the use of HDD eventually withdrew from the implementation after an on-site visit. The installation was considered with the use of a pneumatic jacking machine, commonly known as a mole. However, there was a high risk that the jacking technology, uncontrollable and without the possibility of locating and possible corrections of the planed trajectory, on a length of 37 meters, would fail. The mole would not hit the well and we would not get the desired drop. In addition, vibrations and shock caused by the mole's work may cause damage to neighboring buildings and other facilities such as retaining walls and brick fences. We know of projects in which the use of a mole for a typical culvert under the road caused damage, cracks in the facades of buildings adjacent to the works. The strength of such an impact can be approximated on the basis of the ability to transmit vibrations through a given soil medium, but it is associated with additional expertise and soil tests. The use of a mole in such a close development is a high risk related to possible claims for possible damage. Moreover, such work would be very troublesome. It was impossible to install the pipeline using an open trench, due to the co-location of the installation with a 1.5 meter wide technical belt belonging to the city. In the end, it turned out that the technology with the use of the Gravity Drilling Rig is the only effective and most economical solution for this project.

startowa 01
Location of the S3 starting manhole
startowa 00
The depth of the starting manhole S3
montaz w studni
Mounting of a drilling rig in a well
zerdzie
Preparation of drilling rods
w studni 01
Fixing of the drilling rig in the S3 well
wiertnica studnia 02
Fixing of the drilling rig in the S3 well
lokalizator glowica
Mounting of the transmitter in the drill head
pomiary
Measurements during assembly of the drilling rig at the correct depth in the S3 well
podlaczenie
Connecting the hydraulic hoses responsible for the drive and control of the Gravity Drilling Rig
przewiertak
Fitting the drilling rig with a head enabling drilling through the wall of the S3 starting well
wykop
Preparation of the end chamber
wiewrcenie
Pilot drilling from the S3 starting well to the end chamber
wiercenie 01
Pilot drilling from the S3 starting well to the ending chamber
lokalizacja 02
Verification of the bore path
przewiert wykop
Reaching the final trench with a pilot drilling
rozwiercanie
Equipping the drilling rod with a reamer with simultaneous pulling in of the pipe
mocowanie PE
Connecting the pipe to a reaming head equipped with a swivel
wciąganie PE 02
Pulling the pipe from the end chamber into the S3 start well
wciąganie PE 02
Pulling the pipe from the end chamber into the S3 start well
wciąganie studnia 01
Pulling the pipe into the S3 starting well
koronowanie 01
Reaming the hole in the S3 starting well and pulling the end of the pipe
koniec 02
Reaching the starting well through the reaming head with the installed pipe
koniec 03
Pulling the end of the pipe to be installed into the S3 starting well

The advantage of the Gravity Drilling technology, apart from the efficiency in drilling and accuracy in the implementation of precise installations, is also the mobility of the devices included in the drilling set. All devices are placed in a compact container. This allows you to carry out work virtually anywhere, even densely built-up and with difficult access.

auto
A technical vehicle with full drilling equipment
agregat hydr
Component of the drilling unit - hydraulic unit for driving and controlling the drilling rig

 

CONSTRUCTION OF A RAINWATER DRAINAGE SYSTEM IN GDAŃSK

As part of the construction by the Investor - the Robyg company, of a complex of residential buildings "Zajezdnia Wrzeszcz", located at Bolesława Chrobrego Street in Gdańsk, was built a rainwater drainage system. The length of the installation was 15 meters, with a design slope of 2%. PP Modular Pipes with a diameter of 225 mm were used.

mapa
Construction location

The course of the installation covered the area between the existing sewerage well, located in Bolesława Chrobrego Street, and the starting chamber, located on the construction site of a residential complex.

wiercenie 44
Location of the starting chamber
wiercenie 43
The location of the ending well

Originally, the installation was to be made using other trenchless technologies, including the installation of a steel casing pipe with a jacking machine, the so-called mole, due to lower costs. However, potential contractors withdrew their offers, mainly due to insufficient space for the starting chamber. The second important reason was the need to perform the installation with very high precision, resulting from the vicinity of the underground water supply system running in the construction area. The sewage system under construction was to run a dozen or so centimeters away from the water supply system. Damaging it would cause serious problems and additional significant costs.

In the first stage of the installation, a drilling was made from the starting chamber, in which a sewage well DN 1200 was first built, and then a Gravity Drilling Rig was installed.

wiercenie 02
Pilot drilling from the starting well
wiercenie 09
Pilot drilling from the starting well

After reaching the final well, with the retooled machine, the pulling of the pipe, built of successive segments of Modular Pipes, was started. Previously, of course, it was necessary to drill a hole made with a pilot drill, using a core drill adapted to the diameter of the pipe to be installed. In this case, this activity was abandoned due to practical tests of the new solution of reaming heads. Most of the typical sewage chambers can be easily drilled with just such a head. The problem can only occur in wells with low mechanical strength, where the use of a reamer instead of a core drill may damage the well components. One of the advantages of the Gravity Drilling Rig technology is overcoming hard obstacles, including well construction elements, not by using the force of pushing or pulling the machine, but by properly selecting the geometry of the drill head and the ability of the machine to fully and smoothly control all operating parameters during drilling.

wiercenie 17
Reaming wells with simultaneous pulling of pipes
wiercenie 30
Building a pipe from successive segments
wiercenie 36
Building a pipe from successive segments
wiercenie 41
Delivery of subsequent pipe segments to the ending well

One of the advantages of the Gravity Drilling technology is the ability to work only within the sewage wells involved in the installation. The Modular Pipes we use allow them to be joined in a place limited by the well. The connection itself is effective, tight and durable. We connect the individual pipe segments using a hydraulic squeezer that presses one end of the pipe into the other.

wiercenie 23
Connecting consecutive pipe segments
wiercenie 10
Pulling the pipe built in the ending well into the starting well, where the Gravity Drilling Rig is installed.
wiercenie 22
Ending well. Pulling the pipe with the simultaneous joining of successive segments of Modular Pipes

Finally, just before reaching the starting well, a reaming of the well wall is made to allow the installation of the pipe to be introduced into the starting well.

wiercenie 07
Starting well. Preparation of the machine for reaming the starting well wall
wiercenie 01
Reaming the starting well wall
wiercenie 15
Ending well. Completion of the pipe installation

 

AWARDS AND DISTINCTIONS

GRAND PRIX 2022 FOR GRAVITY DRILLING TECHNOLOGY

The XXVII edition of the WOD-KAN 2022 fair has come to an end. It was a very interesting and fruitful event for us. Our technology and products aroused great interest among those who announced our stand. For many of them, our innovation was a pleasant surprise in the form of a device enabling the fully trenchless construction of underground sewage systems between existing sewage wells in dense urban buildings and the ability to work in all ground conditions and in places with groundwater.

Contact

We are available: Mon-Fri 7: 00-18: 00 at mobile number and via e-mail

 
Contact

 

I hereby agree for my personal data, included in this form, to be processed for contact purposes by the data administrator - Terma Sp. z o.o. with registered office in Czaple 100, 80-298 Gdańsk, Poland, in accordance with the Act of 29 August 1997 on the Protection of Personal Data (Journal of Laws of 1997, No.133, item 883, with later amendments).